Photo: Black Dragon poser extras — Pose Creator (.anim export), posing others with consent, pose sync #117

Closed
opened 2026-09-27 17:16:18 +00:00 by sky_line · 3 comments
Owner

On top of the FS poser port, bring over BD's extras (bdfloaterposecreator.*, bdanimator.*, bdfloaterposer.*):

  • Pose Creator keyframe editor with .anim export for upload;
  • posing other avatars with their consent;
  • optionally, a wire-compatible implementation of BD's ;PoserSync IM protocol, so users can pose together with BD users.

Size: M

On top of the FS poser port, bring over BD's extras (`bdfloaterposecreator.*`, `bdanimator.*`, `bdfloaterposer.*`): - Pose Creator keyframe editor with `.anim` export for upload; - posing other avatars with their consent; - optionally, a wire-compatible implementation of BD's `;PoserSync` IM protocol, so users can pose together with BD users. Size: M
Author
Owner

Part of epic #119.

Part of epic #119.
sky_line added this to the Slipstream project 2026-10-06 15:04:15 +00:00
Author
Owner

Pose Creator done: 02ec45d780 (keyframes over Pose Studio, .anim save / upload / preview). Posing others with consent shipped with Pose Studio (1.2.0 Beta 1-3). Not done: the optional BD ;PoserSync wire protocol. Lands in 1.2.0 Beta 8.

Pose Creator done: 02ec45d780 (keyframes over Pose Studio, .anim save / upload / preview). Posing others with consent shipped with Pose Studio (1.2.0 Beta 1-3). Not done: the optional BD ;PoserSync wire protocol. Lands in 1.2.0 Beta 8.
Author
Owner

Done: Pose Creator (02ec45d780, keyframes over Pose Studio, .anim save / upload / preview) and posing others with consent (Pose Studio, 1.2.0 Beta 1-3) shipped in 1.2.0. The optional Black Dragon ;PoserSync wire protocol was not done; file it separately if wanted.

Done: Pose Creator (02ec45d780, keyframes over Pose Studio, .anim save / upload / preview) and posing others with consent (Pose Studio, 1.2.0 Beta 1-3) shipped in 1.2.0. The optional Black Dragon ;PoserSync wire protocol was not done; file it separately if wanted.
sky_line 2026-10-10 05:48:24 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
sky_line/Slipstream#117
No description provided.